Major issues after Darpan CSI Roll out
Hi friends, Now a days , many BOs are going to be online and migrating over CSI platform. And besides this, we are facing many issues day by day. There are basically three major issues after CSI Roll out 1. Device is not prepared for Roll out This error is almost faced by all BOs while doing day begin in Demobooking app for first time. For doing day begin we need to extract master data from central sever and the same is extracted and be available in local database in CSV format but due to technical issue at severside or connectivity issue , the same can not be synchronized with central server and this causes error. The only solution for this is to check network status of device and to confirm that there is no issue at server side 2. Inventory data is pending After CSI Roll out, device need to load inventory data from central server to local server. And as mentioned in error no 1, if there is network issue or server side issue then inventory data won&